Chile San Pedro II project in Chile

THL was asked end 2018 to assist SGRE with an emergency replacement of 42 blades on PE San Pedro II. The project is located on the beautiful island of Chiloe, a little of north of Patagonia. THL mobilized two new blade lifters (400 & 500 tonometer models) and SPMT’s in order to move the 42 new blades to site over a 20 km road with steep curves and inclinations of up to 20%. Some components were flown in by airplane in order to make sure the project started on time. Each blade was 65 m long and could not be transported by conventional means, the only solution available was mobilizing two-blade lifter units with SPMT’s

See the LinkedIn post and comments and here here and here

What can we do for you?

Curious what we can do for you? Feel free to contact us! Send us your inquiry in order for us to prepare a full proposal.

Team Heavy Lift